Concrete mixing
Your current location: 首 页 > Hot push information

Affordable use of cylinder batching machine

2022-09-22
Affordable use of cylinder batching machine

(1)贵州tangibleCylinder batcherFeeding system: composed of storage hopper and feeding equipment, the main function is to store materials and feed to the weighing hopper under the control of the control system。Method of feeding system: PLD800-1200 type, feeding for belt conveyor;(2) Weighing system: The weighing system is the key part of the batching machine, which is composed of weighing hopper, suspension equipment, weighing system sensor, batching controller, etc。(3)tangibleCylinder batcher用途Electrical control system: The electrical control system is the core component of the batching machine, and its function is to complete the weighing, displaying, operating and completing various active batching sequences of the entire batching machine。The system is mainly composed of two parts: batching controller and strong current circuit。

Affordable use of cylinder batching machine

After the commercial concrete mixing station is completed, it must meet the acceptance standards.Cylinder batcher用途Only in safe production。So, what is the installation and acceptance standard of commercial concrete mixing station, and what requirements do the equipment of mixing station meet to meet the inspection standard。Chongqing Shiqiao Dinggu Construction Machinery Co., LTD., a simple to explain to you: 1.Commercial concrete mixing station mobile mixer,It should be installed on a flat and hard floor,Secure with wooden squares or braces,And maintain level,Do not use tires instead of support,If the use time is longer (generally more than 3 months), the tire should be removed for safekeeping,The end of the axle should be cleaned and rust-proof。2.The fixed mixer of the commercial concrete mixing station should be installed on a firm pedestal. If it is used for a long time, the anchor bolts should be buried. If it is used for a short time, the wooden pillows should be laid under the machine and levelled。3.For the mixer in the main machine of the commercial concrete mixing station, the leakage protector parameter of "one machine, one gate, one leak, one box" should be set to 30M A×0.1S, the motor insulation resistance value should be greater than 0.5MΩ;Protect the neutral line at least two places, the instrument and indicator signal of the operating station are accurate and reliable。4.The transmission mechanism, working device, clutch and brake of commercial concrete mixing station should be fastened, flexible and reliable, and the protective cover is complete。5.For the concrete mixer that needs to be dug with a hopper pit, the pit mouth should be tamped with a cushion height, and the bottom end face of the loading track frame should also be tamped or the back of the bricklaying frame should be supported by wood to prevent long working time and track deformation。6.The steel wire rope used in the commercial concrete mixing station shall not be scrapped, such as rust, broken wire, flattening, etc。7.The safety hook on the body of the commercial concrete mixing station, the hopper upper lifting ear should be intact, when the hopper rises,tangibleCylinder batcher用途Safety hooks should be attached。8.The concrete mixer should be equipped with an awning, no mud around the machinery, clean and tidy, and all kinds of signs are complete。

Affordable use of cylinder batching machine

How do we distinguish the quality of concrete mixing station?The quality of cement is directly related to the quality and durability of the building, and is also the key link in the quality control of the mixing station!However, the current order of the cement industry is not good: unqualified clinker in cement clinker is widespread, the content is far below the standard value is normal, small cement can not be called cement, can only be called powder。Cement supervision is seriously missing!Testing strength, setting time and stability are far from enough。1、tangibleCylinder batcher用途Clinker: standard requirements, calcium silicate mineral is not less than 66%, calcium oxide and silicon oxide mass ratio is not less than 2。But are our cement factories often up to standard?Strength tests are usually performed only。2, cement clinker content: standard requirements, ordinary Portland cement clinker, gypsum content should be greater than or equal to 80%, less than 95%。But now, even if the large cement clinker content is generally only 65% to 70%, let alone the small cement plant near it in Beijing (in fact, can only be called the grinding station, do not know how to make a cement plant name), the general knowledge of small cement clinker is only about 50%。Small cement cannot be called cement。At best, it's a mixture!3.贵州tangibleCylinder batcherTest method: Cement supervision by Technical supervision Bureau,Random inspection once a year,Can't restrain the production of cement plant!The inspection items of the national inspection standards only have strength, setting time and stability,Some chemical indicators are far from adequate!These indicators are easily met with small cement!We should strictly test the clinker,Clinker content testing should be increased when accepting cement,Not only strength, setting time and stability should be tested,当然,Magnesium oxide, trisulfur oxide and other chemical indicators can not be less!

Affordable use of cylinder batching machine

In the production process of concrete mixing station,tangibleCylinder batcher用途Equipment cleaning and vehicle cleaning process will produce a lot of sewage wastewater。At the same time, direct emissions will also cause great harm to the environment。Therefore, the sewage transformation treatment system in concrete production will realize 100% recovery of its wastewater and achieve zero sewage discharge standards。Sewage treatment and renovation system mainly includes concrete transport team discharge chute, sand separator equipment, sewage settling tank, sewage tank agitator, clarification tank, transport pump, filter press, etc。The conventional system has a total of four sump tanks and three clarifier tanks。Each of the 4 sump ponds has a surface guardrail and agitator。And No. 1 pool, No. 2 pool, No. 3 sewage pool is equipped with mud type pump, No. 2 and No. 4 pool is designed with liquid level meter;3 clarifier tanks You each have a sewage type pump。The periodic uniform movement of the agitator in the tank ensures that the water quality in the tank is uniform。The various pools in the sewage treatment system need to be arranged in a certain order, and the overflow pipes are connected to each other at the lower part of the pool, and the pumps are connected to each other at the upper part。When the amount of water in the pool is insufficient, the pump can be used to transport water to maintain the stability of the water。If there is a lot of water in the pool, it will flow back through the overflow pipe provided in the pool, and the water quality will be clarified during the reflux process。In the concrete mixing station, there is a flow tank connected with the sewage tank to collect rainwater into the pool to ensure the cleanliness of the station and reduce the operating cost。The main station and the vehicle cleaning system are equipped with a special flow tank to divert the production sewage to the sewage tank for unified treatment。Through the guided transformation of the entire drainage in the concrete mixing station, the sewage in the mixing station is not drained, and the treated sewage is directly supplied to the mixing station for use and vehicle cleaning after inspection, and the waste residue generated can also be used as added aggregate。tangibleCylinder batcherAchieve zero discharge of sewage treatment。

标签