Concrete mixing stations are becoming more and more common, and more and more people are using concrete mixers。However, many people do not know how to clean a concrete mixer。First, before using the concrete mixer, check that the controller is in good condition。Vertical mixer图片After shutdown, pour the water and stones into the mixing bucket for 10 to 15 minutes for cleaning, and then remove the water and stones。When the operator needs to enter the mixing cylinder for cleaning, in addition to cutting off the power, remove the fuse, but also need to lock the switch box。Secondly, the concrete mixer should be regularly maintained, such as cleaning, lubrication, refueling and so on。Third, we must remember that the accumulation of concrete in the concrete mixing drum cannot be removed by hammering。We had to chisel it out。Fourth, winter use专业Vertical mixer图片Pay attention to cleaning the drum of the concrete mixer with water after the end of the work, and drain the water in the pump, water tank and water pipe to avoid frostbite of the pump, water tank and water pipe。
Winter mixing plant how to maintain the winter season temperature is very low, the construction conditions and the environment are unfavorable, is the frequent season of engineering quality accidents, especially the concrete project。Mixing station as a necessity for engineering equipment,泸州专业Vertical mixerHow to do winter maintenance work?1, the winter temperature is too low, mixing station does not produce, please exclude residual water in time to prevent freezing and freezing water pump。At the same time, pay attention to the water in the water additive pipeline to prevent the water from freezing in the pipeline, affecting normal production。2. It is strictly prohibited to wash the floor with high pressure water。Because high pressure water is not easy to control, it is easy to splash onto the motor, electric control box, wire trough and other equipment。Although all kinds of equipment generally have waterproof measures, a large amount of water with pressure will still cause motor short circuit, electric control box water and other conditions。A long period of soaking water in a cable trough may cause interface leakage and cable string faults, which may cause equipment damage or even safety accidents。3, winter is coming, should be timely remove the mixing station drum next to the sand。Because the sand is wet, if there is too much accumulation, the sand and stone will freeze and cut the drum like a grinder, which is easy to cut off or damage the drum。4, should always check whether the roller is not running the hair clip phenomenon, if the roller does not run, will cause the belt on the roller dry friction, light damage to the roller, heavy damage to the belt。5, mixing station in the non-production should be timely air compressor and air road in the residual gas exclusion, because the residual gas is easy to solidify into water, cold easy to freeze,专业Vertical mixer图片May cause the next production of the gas path is not smooth or the valve and cylinder operation is not good。
The theoretical productivity of HZS75 concrete mixing plant is 75 cubic meters per hour,Equipped with JS1500 double horizontal shaft forced mixer,HZS75 concrete mixing station is a fully automatic concrete mixing set equipment composed of batching, mixing and electrical control system,At the same time, it is equipped with separate manual control, automatic compensation of drop, and compensation of sand and stone moisture content,Can automatically complete the predetermined tank production。With the scientific design of the hopper and track, the aggregate can be conveniently and efficiently held and dumped, and the unloading height is 3.8 meters, with a small amount of investment capital, occupy a small site, less use of equipment, equipment maintenance is easy, easy to operate and other advantages。HZS75 series concrete mixing plant is composed of batching, mixing, electrical control system and other parts of the automatic concrete mixing set equipment, while equipped with a separate manual control, automatic compensation of drop, sand and stone moisture content compensation, can automatically complete the predetermined tank production.The theoretical productivity is 75 cubic meters per hour and the unloading height is 3.8 meters, the storage hopper volume is 8 cubic *3 bins or 4 bins, the supporting host is JS1500 forced double horizontal shaft mixer。The investment capital of HZS75 mixing plant is small, the space is small, the equipment is less, the equipment is easy to maintain, and the equipment can be equipped with the performance control room, so that the equipment is convenient and safe to operate, and the batching machine can also produce high-quality concrete under the condition of accurate measurement。Performance advantages: 1, the use of combined structure, the whole machine installation, relocation is convenient, low equipment cost。2、专业Vertical mixer图片JS series double horizontal shaft forced concrete mixer is used in the host, which has good mixing quality, high efficiency, long life of wearing parts and easy operation and maintenance。3、Vertical mixer图片It adopts new design ideas of electronic weighing, microcomputer control, digital display and other control technology, electronic weighing with buffer device and automatic compensation function, high measuring precision。4, the sand and gravel feeding system adopts large width herringbone belt feeding, with pedestrian walkway, is the ideal choice for the majority of construction units to produce high-quality concrete。
泸州专业Vertical mixerMixing plant is mainly used for concrete engineering, the main purpose is to mix mixed concrete, also known as concrete mixing plant。HZS series commercial concrete mixing plant adopts the international popular modular rapid assembly structure, imported or domestic mixing host, double machine double control computer control mode, anti-noise, anti-dust pollution, environmental protection design,Vertical mixer图片It is a new generation of cement concrete mixing equipment, which is suitable for urban and rural commodity ready-mixed concrete, road and bridge, water conservancy, airport, port and other large infrastructure construction projects and places with large demand for concrete。Mixing station can be divided into single station and double station,As the name implies,Single station that each mixing station has a mixing host,The two-machine station has two mixing machines,Each mixing machine corresponds to a discharge port,Therefore, the double mixing station is 2 times the production capacity of the single mixing station,The two-machine mixing plant is named 2HZS ,For example, 2HZS25 refers to a two-machine mixing plant with a mixing capacity of 2*25=50 cubic meters/hour。
HZS35 concrete mixing plant is a small concrete mixing equipment, the mixing plant adopts JS750 type double horizontal shaft forced mixing machine, special four-fold seal and electric oil pump technology, good mixing quality, high mixing efficiency, is the ideal choice for our customers。Installation Precautions 1.泸州专业Vertical mixerInstallation of the mixer machine: the bottom plane of the mixer chassis is properly raised,Attach the legs to the main engine with hinges,Install the cement scale,水秤,After weighing the admixture,Ready to lift,Measure and adjust engine chassis,Make it horizontal,After the center line of each leg coincides with the center line of the foundation, the anchor bolt can be poured into the reserved pit (or welded between the base and the reserved embedded part)..2. Installation of other parts: after the installation of the main engine and cement silo,Screw conveyor can be installed,Before hoisting,Check the filling of oil and grease at each lubrication point,An empty car running test is to be conducted,Find problems and solve them in time,Part of the dosing machine installation,Position as required by the foundation drawing,The small dosing machine can be placed on the solid foundation pier plane,Large batching machine requires pouring anchor bolts,After the installation of each mechanical part,Check that all lubrication points of various equipment are filled with lubricating oil (the lubricating oil suitable for low temperature conditions must be replaced in winter in Northeast China) or grease,Wiring and empty car running test can be conducted according to the requirements of the manual and electrical schematic diagram。3. The ground screw bolt of the cement silo is poured to the reserved pit of the foundation. When the center line of the cement silo support is adjusted to coincide with the center line of the foundation, the above four flanges are adjusted on the same level (measurement method: theodolite or transparent plastic hose with diameter of 8-10 and color water measurement method), the concrete can be selected for casting。The grade of the concrete used in the reserved pit should be one level higher than the concrete used in the foundation, and in the winter construction, in order to shorten the construction period, the concrete used should be added with early strength antifreeze。Wait for the foundation concrete to set 5-7 days before installing the cement silo body. When installing the cement silo body, it is necessary to measure the verticality of the cement silo body with a theodolite. The verticality is one thousandth of the height。In order to shorten the construction period,Vertical mixer图片In infrastructure, embedded parts can also be used to fix cement silos or mixers instead of anchor bolts。